68 từ viết tắt hay gặp trong kiểm thử phần mềm – THICHBLOG.NET

68 từ viết tắt hay gặp trong kiểm thử phần mềm

IEEE: Institute of Electrical and Electronics Engineers – is a professional association with its corporate office in New York City and its operations center in Piscataway, New Jersey. (After ieee.org)

ISTQB:  International Software Testing Qualification Board

AUT: Application under Test

SUT: System under Test

UAT: User Acceptance Test

API: Application Programming Interface (known as API Testing)

BVT: Build Verification Test (after ISTQB Glossary)

CMMI: Capability Maturity Model Integration

CASE: Computer Aided Software Engineering (after ISTQB Glossary)

CAST: Computer Aided Software Testing (after ISTQB Glossary)

CLI: Command-Line Interface (known as CLI Testing)

COTS: Commercial Off-the-shelf (after ISTQB Glossary)

CCB: Configuration Control Board

CCB: Change Control Board

CTP: Critical Testing Processes

XSS: cross-site scripting

FDP: Fault Detection Percentage

DMZ: Demilitarized Zone

DOS: denial of service

EMTE: Equivalent Manual Test Effort

FMEA: Failure Mode and Effect Analysis

FMECA: Failure Mode, Effects, and Criticality Analysis

FTA: Fault Tree Analysis

FPA: Function Point Analysis

GQM: Goal Question Metric

GUI: Graphical User Interface (known as GUI Testing)

IDS: Intrusion Detection System

LCSAJ: Linear Code Sequence And Jump (After ISTQB Glossary)

SSH: Secure Shell

MTBF: Mean Time Between Failures

MTTR: Mean Time To Repair

MBT: Model-based Testing

RUP: Rational Unified Process

XP: Extreme Programming – is a software development methodology which is intended to improve software quality and responsiveness to changing customer requirements. (After Wiki)

IDEAL: Initiating, Diagnosing, Establishing, Acting and Learning – is an organizational improvement model that serves as a roadmap for initiating, planning, and implementing improvement actions.

RACI: Responsible, Accountable, Consulted, and Informed. It’s a matrix describing the participation by various roles in completing tasks or deliverables for a project or process. It is especially useful in clarifying roles and responsibilities. (After ISTQB Glossary)

SMART: A methodology whereby objectives are defined very specifically rather than generically. SMART is an acronym derived from the attributes of the objective to be defined: Specific, Measurable, Attainable, Relevant and Timely.

DDP: Defect Detection Percentage – the number of defects found by a test phase, divided by the number found by that test phase and any other means afterwards.

DLL: Dynamic Link Library. It is a kind of file that contains specific code that many programs can share. (theo Lifewire)

PDCA: Plan-Do-Check-Act. It is a repetitive four-stage model for continuous improvement (CI) in business process management. (theo techtarget)

SPI: Software Process Improvement (after CMMI)

STEP: Systematic Test and Evaluation Process

TMM: Testing Maturity Model

TMMi: Test Maturity Model integration

TPA: Test Point Analysis

TPG: Test Process Group (after CMMI)

TDD: Test-driven Development

DDD: Data-driven Development

DDD: Database Design Document

DDD: Detailed Design Document

WBS: Work Breakdown Structure (after CMMI)

UAT: User Acceptance Test

ST: System Testing

CI: Continuous Improvement

CI: Configuration Item

CR: Change Request

COQ: Cost of Quality

DOM: Document Object Model

ORD: Object Relationship Diagram

QA: Quality Assurance

QC: Quality Control

QMS: Quality Management System

SDK: Software Development Kit

SRR: Software Requirements Review

V&V: Verification and Validation

UML: Unified Modeling Language

URI: Uniform Resource Identifier

URL: Uniform Resource Locator

Ho Nguyen

Những điều nhỏ nhặt trong hôm nay sẽ tạo nên sự khác biệt lớn vào ngày mai.

admin has 999 posts and counting.See all posts by admin

Leave a Reply

Your email address will not be published.

This site uses Akismet to reduce spam. Learn how your comment data is processed.