PMP: Project Scope vs Product Scope – THICHBLOG

PMP: Project Scope vs Product Scope

  • Project Scope: includes all the work required to deliver the required project product, service or results (collectively known as “deliverables”)
    • Project Scope is the about the project (including all the processes described in the PMBOK® Guide) to deliver the product
    • Project Scope involves the requirements of the product as well as the methods/processes involved to deliver the product
    • Project Scope is documented in the Project Scope Statement / Statement of Work — detailing the results of the project as well as the constraints and assumptions
  • Product Scope: includes the features and functions of the required product, service or result from the project
    • Product Scope is about the product itself and no more
    • Product Scope would describe how the product will look like, how it will work and the results it will deliver (technical specifications)

Ho Nguyen

Những điều nhỏ nhặt trong hôm nay sẽ tạo nên sự khác biệt lớn vào ngày mai.

admin has 875 posts and counting.See all posts by admin

Leave a Reply

Your email address will not be published. Required fields are marked *

This site uses Akismet to reduce spam. Learn how your comment data is processed.